Kaufman Lynn Construction (KL) recently celebrated the topping of the new Brightline Train Station project in downtown Boca Raton. The project on the 1.8-acre site will feature a passenger station with an 8,400 square feet concrete structure housing the security area, market space, seating area, lounges and a large 12,900 square foot concrete platform. The on-site 4.5-level, 171,000 square foot parking garage features approximately 455 spaces, including 64 slots for the adjacent library. The site will also offer 12 electric vehicle parking spaces, bicycle spaces for long-term and short-term storage and six convenient drop-off parking spaces in front of the train station. A service yard and access road will also be constructed to streamline station operations. Construction on the Brightline Boca Raton Station is expected to be completed by the end of2022.
